Upload educational_questions.csv with huggingface_hub
Browse files- educational_questions.csv +11 -0
educational_questions.csv
ADDED
|
@@ -0,0 +1,11 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
problem,solution,answer,subject,level,unique_id
|
| 2 |
+
"You are tasked with planning and managing the excavation and backfilling for a foundation of a small residential building in Pune, Maharashtra. The site measures 100 square meters and the foundation depth is 1.5 meters. The excavation must be manual due to site constraints, and all debris must be removed. Provide a detailed plan considering the local labor availability and cost-effectiveness.","Start by estimating resources: For manual excavation, calculate the volume (100 m² x 1.5 m = 150 m³) and estimate labor based on productivity of 1 m³ per day per laborer. Assume 5 laborers, completing in 30 days. For backfilling, factor in 10% compaction volume. Use local materials and hire additional 3 laborers for backfilling, taking 10 days. Schedule dependencies: commence once site clearance is done. Awaiting completion, monitor drying and settling times before proceeding to subsequent tasks. Ensure safety through PPE and manage logistics by organizing debris disposal. Quality checks include depth accuracy and compaction tests. Maintain safety protocols to prevent trench collapse and manage dust.","Manual excavation and backfilling for 100 m² foundation in Pune, requiring 40 days for completion.","Earthwork (Excavation, Backfilling)",Medium,1
|
| 3 |
+
"Design a project plan for casting an RCC slab for a commercial office space in Bengaluru, Karnataka. The slab covers an area of 200 square meters with a thickness of 150mm, using M25 grade concrete. The formwork is already erected. Consider the urban setting and associated constraints.","Resource estimation: Calculate concrete volume (200 m² x 0.15 m = 30 m³). Procure M25 concrete from a local RMC plant considering 5% wastage. Employ a team comprising 2 skilled supervisors, 8 laborers for mixing and pouring, and 1 pump operator. Duration is 2 days for pouring and leveling. Schedule: Ensure reinforcement checks before pouring. Allow 7 days for curing, requiring water application. The next task is de-shuttering after 14 days. Execution: Sequence from mixing to leveling, with slump tests for quality. Safety: Ensure PPE, manage silica exposure, and secure perimeter. Logistics: Coordinate concrete delivery and storage, minimizing site disruption.","RCC slab casting for 200 m² office space in Bengaluru requires 2 days for pouring, 14 days total with curing.","Concrete Work (PCC, RCC for slabs, columns, drains)",Hard,2
|
| 4 |
+
"Outline a plan for installing external plaster on a hospital extension in Jaipur, Rajasthan. The area is 500 square meters with a specified thickness of 12mm. Consider constraints like dust control and noise regulations.","Resource estimation: For 500 m², calculate plaster volume (500 m² x 0.012 m = 6 m³). Use a 1:4 cement-sand ratio, accounting for 10% wastage. Employ 4 plasterers and 6 helpers, completing in 15 days. Schedule: Start post-brickwork curing. Include 7 days for curing post-plastering. Successors: Painting follows. Execution: Steps from surface preparation to final curing. Quality control: Verify thickness and surface evenness. Safety: Use dust masks, manage scaffolding risks. Logistics: Minimize site impact by storing materials on-site, ensuring compliance with local noise bylaws.","External plastering for 500 m² hospital extension in Jaipur, 15 days for completion, ready for painting after curing.","Plastering (Internal, External)",Medium,3
|
| 5 |
+
"Develop a plan for laying paver blocks for a rural road project in Nashik, Maharashtra. The road segment is 50 meters long and 3 meters wide. Ensure consideration for rural labor and machinery availability.","Resource estimation: Calculate area (50 m x 3 m = 150 m²). Procure paver blocks and sand for bedding, allowing 5% extra for wastage. Plan for 4 skilled workers and 4 unskilled workers over 10 days. Schedule: Ensure sub-base preparation and curing. Post-laying, allow 3 days for settling before traffic. Execution: Include steps from bedding preparation to final compaction. Quality checkpoints: Level checks every 5 meters. Safety: Provide PPE, manage manual handling risks. Logistics: Coordinate material delivery and storage, utilizing local resources.","Laying paver blocks for 150 m² road in Nashik, requires 10 days, 3 days settling before use.","Flooring (Tiling, Paver Blocks, Vinyl, PCC)",Easy,4
|
| 6 |
+
"Create a comprehensive plan for painting an internal wall space of 250 square meters in a commercial building in Chennai, Tamil Nadu. Address challenges like humidity and surface preparation.","Resource estimation: For 250 m², calculate paint quantity allowing for 2 coats and 10% wastage. Employ 2 painters and 2 helpers, estimating 5 days. Schedule: Ensure surface cleaning and primer application. Post-painting, allow 3 days drying before occupancy. Execution: Steps from primer to final coat. Quality: Check uniformity and coverage. Safety: Ventilation and PPE for paint fumes. Logistics: Manage material storage, respecting building occupancy and humidity control.","Internal wall painting for 250 m² in Chennai, requires 5 days, with drying time before use.","Finishing Works (Painting, False Ceiling)",Easy,5
|
| 7 |
+
"You are tasked with planning the concreting of a 200 square meter RCC slab for a small residential building in Pune, Maharashtra. The slab thickness is 150mm and the mix design is M25 grade concrete. Manual mixing is required due to site constraints, and the formwork and reinforcement must be checked prior to pouring. Your plan should include detailed resource estimation, scheduling, and execution strategies. Consider the local labor availability and typical weather conditions for Pune. Note any critical time gaps such as curing periods.","A. Resource Estimation: Materials: Calculate the required concrete volume (200 sqm x 0.15m = 30 cum) and add a 5% wastage factor. Cement: 450kg/cum, Sand: 700kg/cum, Aggregate: 1200kg/cum. Manpower: 2 skilled masons, 4 unskilled laborers for mixing, pouring, and finishing. Duration: 3 days based on manual mixing productivity. Machinery: Hand tools for mixing and pouring; no heavy machinery due to manual mixing constraint. B. Scheduling & Dependencies: Prerequisites: Ensure formwork and reinforcement completion with site engineer sign-off. Task Duration: 3 days for concreting; 7 days of water curing. Successors: De-shuttering after curing. Critical Time Gaps: 7 days of curing. C. Execution & Management Plan: Key Execution Steps: Prepare site, mix concrete manually, pour and level, initiate curing. Quality Control: Slump test at mixer, thickness checks. Safety Protocols: Use PPE, manage wet cement exposure. Logistics: Store materials under cover, ensure water supply for curing.","Plan for manual mixing, 30 cum concrete, 3 days, 7 days curing in Pune.","Concrete Work (PCC, RCC for slabs, columns, drains)",Medium,6
|
| 8 |
+
"Develop a comprehensive project plan for the installation of electrical conduiting in a new commercial office space located in Bangalore, Karnataka. The task involves laying 500 meters of PVC conduit for electrical wiring, with specific attention to safety regulations and efficient resource allocation. The building is a 5-story structure with a basement, and work needs to be coordinated with other ongoing tasks such as plastering and painting.","A. Resource Estimation: Materials: 500 meters of 25mm PVC conduit, junction boxes, bends, adhesive. Manpower: 3 electricians, 2 helpers. Duration: 5 days based on conduit laying productivity. Tools: Drilling machines, cutting tools, PPE. B. Scheduling & Dependencies: Prerequisites: Completion of structural works, prior wiring layout approval. Task Duration: 5 days for conduit laying, coordinated with plastering. Successors: Wiring and fitting installation. Critical Time Gaps: N/A. C. Execution & Management Plan: Key Execution Steps: Mark conduit paths, drill and fix conduits, connect junctions, ensure alignment. Quality Control: Check conduit alignment, secure fittings. Safety Protocols: PPE for drilling, manage debris. Logistics: Store conduits in a specified area, coordinate with other teams to avoid disruptions.","Install 500m PVC conduit in 5 days, coordinate with other trades in Bangalore.","Utilities (Electrical Conduiting, Plumbing/Drainage)",Hard,7
|
| 9 |
+
"You have been assigned to plan the plastering of 150 square meters of internal walls in a new hospital wing in Chennai, Tamil Nadu. The plaster mix is 1:4 and the thickness is 12mm. The task requires coordination with other finishing works like tiling and painting. Provide a detailed plan addressing material needs, manpower, and a step-by-step execution strategy considering local climatic conditions.","A. Resource Estimation: Materials: Cement and sand for 150 sqm at 12mm thickness (1.8 cum of mortar) with 10% wastage. Manpower: 2 skilled plasterers, 3 helpers. Duration: 4 days. Tools: Trowels, straightedges, PPE. B. Scheduling & Dependencies: Prerequisites: Wall surfaces cleaned, efflorescence removed. Task Duration: 4 days for plastering. Successors: Tiling after a 7-day curing period. Critical Time Gaps: 7 days of curing before tiling. C. Execution & Management Plan: Key Execution Steps: Prepare surfaces, apply base coat, finish with top coat, cure. Quality Control: Check thickness, surface evenness. Safety Protocols: PPE, manage plaster dust. Logistics: Store materials properly, manage water supply for curing.",Plaster 150 sqm in 4 days with 7 days curing in Chennai hospital.,"Plastering (Internal, External)",Medium,8
|
| 10 |
+
"Create a detailed project plan for the demolition of a single-story brick structure in a crowded residential area of Kolkata, West Bengal, using manual methods. Address all safety concerns, resource needs, and execution phases, considering the constraints of limited space and noise restrictions.","A. Resource Estimation: Materials: N/A for demolition. Manpower: 5 laborers, 1 supervisor. Duration: 7 days. Tools: Hammers, chisels, PPE. B. Scheduling & Dependencies: Prerequisites: Utility services disconnected. Task Duration: 7 days for manual demolition. Successors: Site clearance and preparation for new construction. Critical Time Gaps: N/A. C. Execution & Management Plan: Key Execution Steps: Erect safety barriers, commence with roof removal, proceed with walls, clean site. Quality Control: Monitor structural stability during demolition. Safety Protocols: PPE, noise control, debris management, ensure pedestrian safety. Logistics: Manage debris disposal, coordinate with local authorities for road closures if needed.","Manual demolition in 7 days, focus on safety and noise in Kolkata.",Demolition (Manual),Hard,9
|
| 11 |
+
"Design a project plan for laying 200 square meters of paver blocks for a pedestrian walkway in a public park in Jaipur, Rajasthan. The task should consider the aesthetic requirements of the park, the durability of materials, and efficient use of resources. Coordination with landscaping efforts is essential.","A. Resource Estimation: Materials: 200 sqm of paver blocks, sand for bedding, cement for edge restraint, 5% wastage. Manpower: 4 skilled workers, 2 helpers. Duration: 6 days. Tools: Compactors, leveling tools, PPE. B. Scheduling & Dependencies: Prerequisites: Site graded and compacted. Task Duration: 6 days for laying pavers. Successors: Landscaping and lighting installation. Critical Time Gaps: N/A. C. Execution & Management Plan: Key Execution Steps: Prepare base, lay bedding sand, install pavers, compact, and grout. Quality Control: Check alignment, level, and joint consistency. Safety Protocols: PPE, manage heavy lifting. Logistics: Store pavers near site, coordinate with landscape team.","Lay 200 sqm paver blocks in 6 days, coordinate with landscaping in Jaipur.","Flooring (Tiling, Paver Blocks, Vinyl, PCC)",Medium,10
|